Covering Saleh Wulu School
Signing of the contract :
Our company, Hamza Abbas Company, concluded a contract with the Education Committee in the city of Manbij with the aim of covering the Salih Lulu School located in the city of Manbij, which is considered one of the most important schools in the city due to its geographical location in the city center, the large area it occupies, and the number of students enrolled in it. The contract duration is 180 days, starting on 8/8/2023. The project was implemented in accordance with the required technical specifications, within the specified time period, and within the limits of the allocated budget .
Evaluation and planning :
One of our company’s engineers visited the project site, accompanied by a specialized committee from the Education Committee, to hand over the project site to us and determine the work mechanism that must be followed to complete all the work entrusted to our company to implement .
Mechanism of Action :
We employed an integrated team of engineers with different specializations, logisticians, workers, and technicians, and developed a work plan with a timetable that matches the contractual duration of the project to complete the work on time and with the highest quality .
Among the tasks assigned to our company to carry out are :
1-Preparing the school building internally:
interior plastering work for the walls and ceilings, painting work for th e walls and ceilings, ceramic work for the walls with a height of 1.5 meters, tiling work for the floors of classrooms and corridors, installing windows and doors, installing wall blackboards for the classrooms, and serving the school building with health and electrical services .
2 -Preparing the school building externally:
We carried out a unique work for the first time in the city of Manbij. The front facade of the school was made of Ecobond, and the side and back facades were made of mankoush paint with thoughtful color coordination to be like a wonderful artistic painting .
3-Preparing the bathroom block:
interior plastering work for the walls and ceilings, painting work for the walls and ceilings, ceramic work for the walls at the required height, tiling work for the floors, installing doors and windows, and carrying out sanitary work to the fullest extent, as it is the basic element in the bathrooms to perform their work and serving the block with electrical work .
4 – Preparing the courtyard and the external fence:
tiles for the courtyard in consistent colors and a group of drawings within the tiles, and building an external wall for the school supported by a group of columns and a chain of reinforced concrete and spraying it with Tyrolean spray, the color of which is consistent with the colors of the courtyard tiles and the colors of the facades of the school building .
5 – Preparing playgrounds:
We have equipped a football field and a basketball court with the required sizes and technical conditions, conforming to international specifications for implementing playgrounds.
Evaluation and project delivery :
The project was completed on time and delivered to a specialized receiving committee formed by the Education Committee, from which we received praise for the quality of the work, the speed of implementation, and the organization followed in the work .
And here we are today, Hamza Abbas Company, adding a new success to our series of successes by implementing the largest and most important projects in the city. This success is due to cooperation, organization, and working as one team of the company’s management, engineers, technicians, and workers .