Construction of a General Clinic in Al-Asaliyah Village, Manbij
Contract Signing
Building a general clinic in the village of Al-Asaliyah in the countryside of Manbij.
On August 15, 2023, our company, Hamza Abbas, signed a contract with the Health Committee in Manbij and its countryside to establish a complete building from foundation to final finishing for use as a general clinic for the village of Al-Asaliyah and nearby villages.
Project Planning and Timeline
One of our specialized engineers reviewed the technical specifications, engineering plans, and financial estimates prepared to execute this project.
They developed a timeline to complete the work entirely, which was set at ninety days.
An agreement was reached between our company and the Health Committee on a contractual period of ninety days to complete the work and deliver the building in its final form.
I will provide a detailed explanation of the sequence of tasks we carried out and how we executed them:
Foundation Work
Our survey engineer surveyed the foundation location, after which we excavated and poured the foundations and laid the shenagat (foundation walls) according to the attached plans.
Reinforced Concrete Works
We started by pouring the columns and then the slab, adhering to the required concrete caliber according to the technical specifications and the reinforcement steel shown in the attached plans.
Finishing Works
After completing the structure, we began the finishing process, including blockwork, internal and external plastering, painting, roughcast, ceramics, and tiling.
Electrical and Plumbing Works
We executed electrical and plumbing installations according to the required technical specifications, using the highest quality materials and the latest techniques and skills.
Sidewalk and Gate Installation
We constructed a perimeter sidewalk around the building using interlock bricks and installed a main gate for the building’s fence.
Final Touches and Completion
Finally, we completed the final touches, cleaned the building from any construction debris, and prepared it fully within the contractual period for official handover to the specialized acceptance committee formed by the Health Committee to ensure compliance with the required technical specifications and the completion of all works.
Project Success Factors
The credit for the accomplishment, success, and timely delivery of this project goes to the skill of our team in the company, including engineers, technicians, and workers, along with the coordination between our team and the supervisory committee appointed by the Health Committee.
Today, Hamza Abbas Company proudly announces the completion of another project, adding another success to our track record.